Or email us: hello@siteflo.com
03 · Financial & Compliance
Keep the money moving and the inspections on track.
Log permits directly in chat, tie them to the right stage, and track their status from filing to approval. Siteflo flags overdue permits before they become a schedule problem, and links everything back to the stage it belongs to so nothing gets missed.
Electrical permit approved
Inspection can be scheduled now
Track every inspection from scheduling to result. Log pass, fail, or re-inspection status directly in chat, tied automatically to the right stage. Siteflo surfaces upcoming and overdue inspections so nothing slips through the cracks before your next phase begins.
Framing inspection passed
Drywall is cleared to start
When Siteflo detects a stage is done, it tells you a draw request is ready. Log it in one message, tie it to the completed stage, and track it from submission to funding. No more leaving money on the table because paperwork fell through the cracks.

$142,500
Draw #3 · unlocked by framing completion
30 minutes. No slides. No pitch deck. Just the product.